SiBE041029EC
Trial Operation and Field Settings 104
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................105
2. Forced Cooling Operation ...................................................................106
3. Trial Operation ....................................................................................107
4. Field Settings ......................................................................................108
4.1 When 2 Units are installed in 1 Room ..................................................108
4.2 Facility Setting (Cooling at Low Outdoor Temperature) .......................109
4.3 Jumper and Switch Settings.................................................................110
5. Silicon Grease on Power Transistor / Diode Bridge............................111