4Commissioning
Installationmanual
9
AZQS100~140B8V1B+AZQS100~140B7Y1B
Splitsystemairconditioners
4P3855281–2014.08
Connectingtothe
frame
Whencablesareroutedfromtheunit,a
protectionsleevefortheconduits(PG
insertions)canbeinsertedattheknockout
hole.
Whenyoudonotuseawireconduit,
protectthewireswithvinyltubesto
preventtheedgeoftheknockoutholefrom
cuttingthewires.
a b c d e
A B
AInsideoftheoutdoorunit
BOutsideoftheoutdoorunit
aWire
bBush
cNut
dFrame
eHose
5 Reattachtheservicecover.
6 Connectanearthleakagecircuitbreakerandfusetothepower
supplyline.
3.6 Finishingtheoutdoorunit
installation
3.6.1 Tofinishtheoutdoorunitinstallation
1 Insulateandfixtherefrigerantpipingandinterconnectioncable
asfollows:
f
b
a
e
d
c
a Gaspipe
b Gaspipeinsulation
c Interconnectioncable
d Liquidpipe
e Liquidpipeinsulation
f Finishingtape
2 Installtheservicecover.
3.6.2 Tochecktheinsulationresistanceofthe
compressor
NOTICE
If, after installation, refrigerant accumulates in the
compressor, the insulation resistance over the poles can
drop,but ifitis atleast1 MΩ,thenthe unit willnotbreak
down.
Usea500Vmegatesterwhenmeasuringinsulation.
Donotuseamegatesterforlowvoltagecircuits.
1 Measuretheinsulationresistanceoverthepoles.
If Then
≥1MΩ InsulationresistanceisOK.Thisprocedure
isfinished.
<1MΩ InsulationresistanceisnotOK.Gotothe
nextstep.
2 TurnONthepowerandleaveitonfor6hours.
Result: The compressor will heat up and evaporate any
refrigerantinthecompressor.
3 Measuretheinsulationresistanceagain.
4 Commissioning
NOTICE
NEVER operate the unit without thermistors and/or
pressure sensors/switches. Burning of the compressor
mightresult.
4.1 Checklistbeforetestrun
DoNOToperatethesystembeforethefollowingchecksareOK:
Theindoorunitsareproperlymounted.
Incaseawirelessuserinterfaceisused:Theindoorunit
decorationpanelwithinfraredreceiverisinstalled.
Theoutdoorunitisproperlymounted.
Thefollowingfieldwiringhasbeencarriedoutaccording
tothisdocumentandtheapplicablelegislation:
Betweenthelocalsupplypanelandtheoutdoorunit
Betweentheoutdoorunitandtheindoorunit
ThereareNOmissingphasesorreversedphases.
The system is properly earthed and the earth terminals
aretightened.
The fuses or locally installed protection devices are
installed according to this document, and have not been
bypassed.
The power supply voltage matches the voltage on the
identificationlabeloftheunit.
Thereare NO loose connectionsor damaged electrical
componentsintheswitchbox.
TheinsulationresistanceofthecompressorisOK.
There are NO damaged components or squeezed
pipesontheinsideoftheindoorandoutdoorunits.
ThereareNOrefrigerantleaks.
The correct pipe size is installed and the pipes are
properlyinsulated.
Thestopvalves(gasandliquid) ontheoutdoorunitare
fullyopen.