What to Do Before Operation Si39-303
202 Operation Manual
2. What to Do Before Operation
This operation manual is for the following systems with standard control. Before initiating
operation, contact your Daikin dealer for the operation that corresponds to your system type and
mark.
If your installation has a customized control system, ask your Daikin dealer for the operation that
corresponds to your system.
Outdoor units
!
Names and functions of parts
RXYQ series
REYQ series
Cool/heat
changeover remote
control switch Operation modes
Inverter series
heat pumps RXYQ
series
yes no
Heat recovery series
heat pumps
REYQ
series
yes no
1. Outdoor unit
2. Indoor unit
3. Remote controller
4. Inlet air
5. Outlet air
6. BS (Branch selection) unit
7. Cool/heat changeover remote control switch
(Left figure shows systems with changeover
remote control switches)