EasyManua.ls Logo

Dake SE-912 - MINIMUM ROOM SPACE FOR MACHINE OPERATION; MAKE PROPER TOOTH SELECTION

Dake SE-912
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 8 -
(3). TURN OFF the power before wiring, & be sure
machine in proper grounding, Overload & circuit
breaker is recommended for safety wiring.
(4). CHECK carefully if the saw blade is running in
Counter-clockwise direction, if not reverse the
Wiring per circuit diagram then repeat the running
Test.
(5). KEEP machine always out from sun, dust, wet,
raining area.
3. MINIMUM ROOM SPACE FOR MACHINE OPERATION
4. MAKE PROPER TOOTH SELECTION
For maximum cutting efficiency and lowest cost per cut, it is important to select the blade with
the right number of teeth per inch (TPI) for the material being cut. The material size and shape
dictate tooth selection.
912(B.G)
912(DR.GDR)

Related product manuals