EasyManua.ls Logo

Danfoss OSQA - PP End Cover Installation

Danfoss OSQA
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Guide amplifier spool (12) into place.
4. Guide directional spool (25) into place.
Installing PP end cover
1. Place spring stop (27) on the directional spool (25).
2.
The spring must be fitted at the PP-connection.
Service Manual
OSQA/OSQB
Assembly
34 |
©
Danfoss | July 2016 HN25D293 | AX00000127en-US0101