EasyManua.ls Logo

Danfoss OSQA - Page 35

Danfoss OSQA
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Place spring (13) with Vaseline in amplifier spool (12).
3. Place O-rings, 2x (57), 2x (58) and 2x (59) and spring stop (30) in end cover (66).
a) Place large spring (29) and small spring (28) in end cover (66).
Service Manual
OSQA/OSQB
Assembly
©
Danfoss | July 2016 HN25D293 | AX00000127en-US0101 | 35