Project with
a Central
Pressure
Input
We often come across systems with the central
pressure input with the distribution of the medium to
either side of the input. It is possible to balance such
project by virtually dividing it into two separate projects.
The two projects are measured and balanced
individually and subsequently drawn together using
the Bind Projects command as follows.
40 HEC