32
Data Aire, Inc.
Monthly Maintenance Inspection Checklist
Model No. __________________ Serial No. ____________________
Prepared by: _______________ Date: ___ / ___/ 201__
Air Filters
___ Checkforrestrictedairow
Air Distribution Section
___ Check for restriction in grille(s)
Compressor
___ Check for leaks
Refrigeration Cycle/Section
___ Check crank case temperature
Air Cooled Condenser (if applicable)
___ Condenser coil clean
___ Motor mounts tight
___ Motor fan bearings in good condition
___ Refrigeration lines properly supported
Water/Glycol Fluid Cooler (if applicable)
___ Water regulating valve function
___ Check for water/glycol leaks (piping area)
Glycol Pump(s)
___ Glycol leaks (pump area)
___ Pump operation
___ Auto air vent clean of mineral deposits
Condensate Drain and Pump (if applicable)
___ Check for water leaks
___ Checkforrestrictedairow
___ Pump operation
Steam Generating Humidier
___ Check canister for deposits and water level
___ Check condition of steam hose and clamps
Electrical Panel
___ Check contactor operation
___ dap4 control panel operations
Equipment Runtimes
Condenser _________ hrs
Compressor _________ hrs
Reheat No. 1 _________ hrs
Reheat No. 2 _________ hrs
Reheat No. 3 _________ hrs
Humidier _________ hrs
Dehumidication _________ hrs
Energy Saver _________ hrs
___ Reset all to read zero runtimes
Temperature/Humidity set at: ___° ___% RH