8
1.2 Model Identication
1.3 Inspection
This Data Aire CRAC unit has been factory run-tested and has gone through a comprehensive inspec-
tion prior to its packaging and shipment to ensure that it arrives in excellent condition. However, ship-
ping damage can occur and a visual inspection of the outer crating immediately upon delivery should be
performed. Upon arrival of the unit and before unpacking it, verify that the labeled equipment matches
the bill of lading.
Note: any external damage or transportation damage on the freight carrier’s
forms. Inspect the unit itself for internal damage. A claim should be led with
the shipping company if the equipment is damaged or incomplete.
Loose items such as remote control panels, disconnect switch handles, and spare air lters are packed
inside the unit. Refer to the yellow shipping tag located on the unit door for details.
NOTE: Freight damage claims are the responsibility of the purchaser. Action
to recover losses should be led immediately. Please notify factory personnel
of any claims.