MTR-3 Installation Instructions
DEIF A/S Page 32 of 51
Register table for the actual measurements (VERSION 1)
Parameter
Time Into Period (minutes)
Apparent Power Total (St)
Active Power Total (Pt) -
(positive)
Active Power Total (Pt) -
(negative)
Reactive Power Total (Qt) - L
Reactive Power Total (Qt) - C
MAX DEMAND SINCE LAST RESET
Apparent Power Total (St)
Active Power Total (Pt) -
(positive)
Active Power Total (Pt) -
(negative)
Reactive Power Total (Qt) - L
Reactive Power Total (Qt) - C