Figure 46. Protection bracket
10. Install the H7.8 standoff, as shown in the following figure.
Figure 47. Standoff installed
11. Assemble the standoffs on the heat sink. Screw the standoffs tightly into position, as shown in the following figures.
Installation procedure for 5G expansion module
31