EasyManua.ls Logo

Dell 5200 - Part V: Installation Procedure for 2 X Gbe with Poe Ufm Module

Dell 5200
77 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation procedure for 2x GbE with PoE
uFM module
About this task
Installation requires the removal of WiFi, as well as COM3 and COM4 ports. The four-port COM cable will be replaced with an
included dual-port COM cable.
Table 16. Expansion module packing list
Item Quantity Notes
Screw M3 x 6L 2 Torque required: 4.0 kgf.cm
Screw M3 x 4L 14 Torque required: 4.0 kgf.cm
Screw M3 x 5L 1 Torque required: 4.0 kgf.cm
Standoff H4 4 Torque required: 4.5 kgf.cm
Nut M3 4 Torque required: 4.0 kgf.cm
Screw M2.5 x 6L 2 Torque required: 3.0 kgf.cm
Cable tie 2 -
Rubber cap 2 -
Cable clip 1 -
Sheet metal I/O panel 1 -
Bracket 1 -
PoE PCBA 1 -
PoE mPCIe 1 -
Dual-port COM cable 1 -
Cable 2 -
Thermal pad 1 -
Table 17. Tools needed
Tool Notes
Phillips head screwdriver Small size
Needle-nose pliers
Nut driver 4.5 mm, 5 mm, 5.5 mm, 10 mm
Steps
1. Remove the eight screws from the bottom panel of the EGW-5200, as shown in the following figure, and remove the bottom
panel.
V
Installation procedure for 2x GbE with PoE uFM module 45

Related product manuals