Amplon RT Series 63
7.5 Connection to the Optional Maintenance Bypass Box (MBB)_ for Single
UPS
For the MBB connection, the power cables and cable glands are installed on the UPS before the
UPS is shipped*
1
, as shown in Figure 7-25.
(Figure 7-25: Power Cables and Cable Glands Installed before Shipment)
NOTE:
*
1
This depends on different UPS model requirements. Please see the information
below.