2. INSTALLATION
Page 5 © 2002-2007 DH Instruments, a Fluke Company
2
2
.
.
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
2.1 UNPACKING AND INSPECTION
2.1.1 REMOVING FROM PACKAGING
PPC3 is delivered in a corrugated container with high density polyethylene inserts to hold it in
place; or in the optional molded, medium density polyethylene shipping case with a custom
foam insert.
Remove the PPC3 and its accessories from the shipping container and remove each element
from its protective plastic bag.
2.1.2 INSPECTING CONTENTS
Check that all items are present and have no visible damage.
A standard PPC3 includes all items indicated in Table 2.
Table 2. PPC3 Packing List
DESCRIPTION PART #
1 ea. PPC3 Pressure Controller/Calibrator FAM007
1 ea. Calibration Report 550100
1 ea. Test Report 550200
ACCESSORIES: 401918 (401918-CE)
1 ea. Operation and Maintenance Manual 550128
1 ea. Power Cord (7.5 ft.) 100770 (100770-CE)
1 set (6) Rubber Feet Caps 400203
1 ea. Drivers Connector 401382
1 ea. General Accessories Disk (white CD) 102987