EasyManua.ls Logo

Diesse MINI-CUBE - Materials required for use of the instrument; Maintenance procedure

Diesse MINI-CUBE
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rev. 1.2 (12.2021) MINI-CUBE | SERVICE MANUAL 12
Materials provided
The MINI CUBE is supplied with the following materials:
User Manual
USB mass storage with multi-lingual manual
Non-capacitive touch stylus
DC power Supply (see characteristics in
Technical Specifications
section)
One power cable for each module according to IEC International Standards
(Female Plug IEC 320 C-13; Male Plug Schuko EEC 7-VII; Rating: 10A / 250V
AC).
USB cable
Certificate of Analysis
Packing list
Figure 3
Do not throw away the original packaging in case of further transportation of
the instrument in the future.
1.5 Shutting down and shipping
Before shutting down and shipping the instrument, it is recommended
carrying out the following sanitizing procedure:
A) The instrument must be turned off and cleaned internally of all residues or
spillage with a liquid detergent and left to dry.
B) Use one of the ready-to-use spray cans of isopropyl alcohol available on the market.
C) Spray well on the sample-holder.

Other manuals for Diesse MINI-CUBE

Related product manuals