EasyManua.ls Logo

Diloc VISION9+ - Installation Instructions; F-Gas Handling and Certification

Diloc VISION9+
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Installation instructions
8.1 F-Gas instruction
Ths product contans fluornated greenhouse gases covered by the Kyoto protocol.
The fluornated greehouse gases are contaned n hermetcally sealed equpment.
Installs, servces, mantans, repars, checks for leaks or decommssons equpment and product
recyclng should be carred out by natural persons that hold relevant certfcates.
If the system has a leakage detecton system nstalled, leakage checks should be performed at least
every 12 months, make sure system operate properly.
If product must be performed leakage checks, t should specfy Inspecton cycle, establsh and save
records of leakage checks.
C
Note: For hermetcally sealed equpment, portable ar condtoner, wndow ar
condtoner and dehumdfer, f CO
2
equvalent of fluornated greenhouse gases s less
than 10 tonnes, t should not perform leakage checks.
Splt-type room ar condtoner / User Manual
67 / 106 EN

Related product manuals