5. Place the heater in its • nal position and mark the • xing holes through the location holes
visible through the back of the heater.
6. Six • xing positions must be selected for models XLE100, XLE125, XLE150 and at least 4
• xing positions for models XLE050 and XLE070. Fig. 6.
Common • xing points for all heater sizes are shown in both Fig. 4 and Fig. 5.
Mark the positions for the • xing holes.
Move the heater away from the wall, drill the holes and • t the wall • xings best suited to the
application.
Secure the heater to the wall using correct quantity of screws required per model, using the
appropriate screw • ttings.
NB: Do not fully tighten screws until energy cells are fully loaded to ensure full weight is
on feet and not on the wall ! xings.
NOTE: UNDER NO CIRCUMSTANCES SHOULD ANY SCREWS BE REMOVED WITHOUT
FIRST REMOVING ALL ENERGY CELLS FROM THE HEATER.
NEVER FREE THE HEATER FROM THE WALL WITH ENERGY CELLS REMAINING INSIDE
THE HEATER CAVITY.
NOTE: ANY FIXING DROPPED INTO HEATER MUST BE RETRIEVED AS THEY MAY
IMPACT PRODUCT SAFETY OPERATION.
Fig. 6
9