30
DINO RXT
4.3.11. Inspection of the battery, elecrical devices and wiring
Thorough inspection of the electric system
check that the control panel boxes are dry, clean and tight.
check the condition of the cable connections and their protection against moisture
check the condition and attachment of the limit switches
checkthelimitswitchlead-throughsfortightness
check the connections of the electric valves
check the connections of the solenoid valves
perform visual inspection of all electric wiring
check the condition of the mains cable plug
4.3.12. Measure hydraulic pressures
1. connectthepressuregaugetothemeasuringpoint(PMPP)
2. maketheoilowthroughthereliefvalvebydrivingoneofthemovementsagainstthe
end stop
3. read the peressure from the gauge
max.pressurewithwarmoil(40–60°C): 20–20,5MPa(200–205bar)
turningpressure6MPa(60bar)
if you have to readjust the pressure setting, secure the new setting with a seal.