8. Routine maintenance plan
Perform the following operations and checks every 6 months according to intensity of use of the
automation.
Without 230 V~ power supply and batteries if present:
- Lubricate the levers of the gearmotor.
- Lubricate the rotation pivot of the gate leaf.
- Lubricate the gate leaf hinges.
- Check the good conditions of the electric connection.
- Check that the fixing screws of the gearmotor are firmly tightened.
Clean the inside of the cases and check that drain is not clogged.
- Check the value of the capacity of the motor condenser.
Reconnect the 230 V~ power supply and batteries if present:
- Check the power adjustment.
- Check the good operation of all command and safety functions (photocells).
- Check the good operation of the release system.
NOTE: For spare parts, see the spares price list.