EasyManua.ls Logo

DITEC ENTREMATIC SMART RESET - User Manual

DITEC ENTREMATIC SMART RESET
44 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
DITEC S.p.A.
9LD0RQV%DQ¿&DURQQR3HUWXVHOOD9$,7$/<
7HO)D[
ZZZGLWHFLW GLWHF#GLWHFYDFRP
60$57 5(6(7
'7 UHY 
,62 
&HUW Q
0DQXDOH GL LQVWDOOD]LRQH
PDQXWHQ]LRQH XVR
,VWUX]LRQL RULJLQDOL
,QVWDOODWLRQ PDQXDO
PDLQWHQDQFH XVH
2ULJLQDO LQVWUXFWLRQV
IT
EN
Question and Answer IconNeed help?

Do you have a question about the DITEC ENTREMATIC SMART RESET and is the answer not in the manual?

DITEC ENTREMATIC SMART RESET Specifications

General IconGeneral
BrandDITEC
ModelENTREMATIC SMART RESET
CategoryGate Opener
LanguageEnglish

Summary

General Safety Precautions

Installation Safety Precautions

Instructions for professional personnel on safe installation and adherence to regulations.

User Safety Precautions

General safety warnings for users of the vertical-roll door.

Technical Characteristics

Three-Phase Control Panel (48 E) Specifications

Technical specifications for the 48E three-phase control panel.

Inverter Control Panel (47 E) Specifications

Technical specifications for the 47E inverter control panel.

Component Lists

Component List

List and diagram of all product components.

Packing List

List of components included in the product packaging.

Mechanical Installation

Checking the Opening

Verifying installation opening dimensions and structural integrity.

Fitting the Uprights

Installing vertical support columns and ensuring perpendicularity.

Rolling Shaft Installation

Mounting the rolling shaft and its components to the uprights.

Gearmotor Installation (K22)

Mounting and connecting the K22 gearmotor to the shaft.

Safety Linear Encoder (SLE) Installation

Fixing the SLE to the sliding guide and connecting it.

Curtain Positioning

Inserting and positioning the curtain into the guides.

Photocell Installation

Mounting and connecting safety photocells.

Electric Connections

Control Panel Connections

Inserting and connecting pre-wired cables to the control panel housing.

Control Panel, Motor, Security Wiring

Cable layout and positioning for control panel, motor, and security.

Safety Photocell Connections

Wiring and connecting safety photocells as per diagram.

Electronic Control Panel Operations

48 E Control Panel Connections

Detailed input/output connections for the 48E electronic control panel.

48 E Signals and Settings

Explanation of indicators, dip-switches, and buttons for the 48E panel.

47 E (Inverter) Control Panel Connections

Detailed input/output connections for the 47E electronic control panel.

47 E Signals and Settings

Explanation of trimmers, dip-switches, and LEDs for the 47E panel.

Adjustment and Starting

Limit Switch Adjustment

Adjusting the limit switches for door open/close points.

Safety Linear Encoder (SLE) Adjustment

Adjusting the obstacle detection sensitivity of the SLE.

Curtain Tensioning Adjustment

Adjusting the curtain tension and guide alignment.

Troubleshooting

Troubleshooting Guide

Common problems, their causes, and verification steps.

Maintenance

6-Month Maintenance Plan

Recommended intervals for replacing parts during preventive maintenance.

Use Instructions

Control Buttons Functionality

Explanation of the function of different control buttons.

Manual Operation Procedure

Procedure for manually raising the curtain during power failure.

Applications and Compliance

Product Application Details

Information on intended use, service life, and operating conditions.

EC Declaration of Conformity

Manufacturer's declaration of compliance with EC directives and standards.

Related product manuals