13
IP1639EN • 2012-07-31
7. ROUTINE MAINTENANCE PLAN
Perform the following operations and checks every 6 months according to intensity of use of the automation.
Disconnect the 230 V~ power supply and batteries if present:
- Clean and lubricate, using neutral grease, the turning pins, the hinges of the gate and the drive screw
- Check that fastening points are properly tightened.
- Check the electrical wiring is in good condition.
Reconnect the 230 V~ power supply and batteries if present:
- Check the power adjustments.
- Check the good operation of all command and safety functions (photocells).
- Check the good operation of the release.
- If the E2HOB control panel is mounted, check for battery continuity by powering off and performing several
manoeuvres in sequence. Upon test completion, power back on (230 V~).
WARNING: For spare parts, see the spares price list.