EasyManua.ls Logo

DITEC OBBI3BH - Routine Maintenance Plan

DITEC OBBI3BH
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
IP1639EN • 2012-07-31
7. ROUTINE MAINTENANCE PLAN
Perform the following operations and checks every 6 months according to intensity of use of the automation.
Disconnect the 230 V~ power supply and batteries if present:
- Clean and lubricate, using neutral grease, the turning pins, the hinges of the gate and the drive screw
- Check that fastening points are properly tightened.
- Check the electrical wiring is in good condition.
Reconnect the 230 V~ power supply and batteries if present:
- Check the power adjustments.
- Check the good operation of all command and safety functions (photocells).
- Check the good operation of the release.
- If the E2HOB control panel is mounted, check for battery continuity by powering off and performing several
manoeuvres in sequence. Upon test completion, power back on (230 V~).
WARNING: For spare parts, see the spares price list.
i

Other manuals for DITEC OBBI3BH

Related product manuals