EasyManua.ls Logo

DK2 Power OPC506E - Step 2: Install Chutes

DK2 Power OPC506E
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16 | OPC506E(X) man.
STEP 2: CHUTES
1. Install the feed and expulsion chutes on the two hinges. To seat the hinge pins for the first
time a rubber mallet may need to be used to tap the pins into place, these are tight fitting to
reduce vibration noise.
2. Close each chute, and latch them.
3. Assemble the chip shield to the feed chute.
4. Plug the safety key shut o wire connectors together on the feed chute.
ENGLISH

Related product manuals