Scaffold
Erection Guidelines
Recommendations
Prior to Erecting Ringlock the following is recom-
mended:
The job site should be inspected to ensure that the
ground or other supporting structure is strong
enough to safely support the self-weight of the scaf-
fold and the imposed loads on the platforms. In addi-
tion, please make yourself aware of the proximity of
power lines, overhead obstructions and weather
conditions. These could pose a possible danger dur-
ing the erection, use and dismantling of Ringlock and
should be evaluated and adequately addressed in
accordance with the requirements for provision of
Risk Assessments and Method Statements.
Check the condition of the building façade at the pro-
posed tie locations.
The spacing of the Standards should be in accord-
ance with the relevant layouts, if available.
If design drawings of the scaffold are required, check
the requirements of the local authority with respect to
what must be shown on the drawings (load rating,
erection/dismantling instructions etc.).
All equipment should be inspected prior to use to
ensure that it is in good condition and is serviceable.
Damaged or deteriorated equipment must not be
used.
Avoid storing or handling scaffold components below
or close to electrical power lines. Check the require-
ments of the authority having jurisdiction for the
exclusions zones.
Care must be taken when scaffolding work is in close
proximity to exposed and insulated electrical lines
and hidden electrical cables (for example, cable con-
cealed behind a surface where a scaffold anchor is
to be fitted).
Be aware of all Client and work related site safety
procedures as well as reference to local/regional and
National legislation.
Be aware of possible dangers regarding explosions
or fire.
Ensure that the scaffolders are trained and fully
instructed to erect Ringlock system scaffolding.
Check the safety and function of all the tools that are
used during erection.