EasyManua.ls Logo

Doka Ringlock - Page 71

Default Icon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Information Ringlock General
71999817902 - 10/2022
Method of Lifting Scaffold
There are multiple methods to configure the lifting
points of a scaffold. Below are some of the typical meth-
ods of lifting scaffolds in the industry.
Lifting Lugs (Hanging Standard)
Lattice Girder with Sling
Temporary Bracing
Bracing is required prior to each lift to minimize dis-
placement and torsion of the scaffold in any direction to
prevent displacement and rotation during lifting.
Temporary Bracing is job specific and is dependent on
the lift arrangement and rigging location. Please refer to
an Doka technical representative for the proper design
and configuration of any Temporary Bracing on any
Ringlock System.
Temporary Bracing for 10 Leg Tower
Temporary Bracing for 4 Leg Tower

Other manuals for Doka Ringlock

Related product manuals