EasyManuals Logo

Doosan GC25P-3 User Manual

Doosan GC25P-3
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #148 background imageLoading...
Page #148 background image
- 147 -vLP Engine G430(3.0L) Base Engine Service Procedure
10. Measure the pin bore-to-piston clearance.
(1) The piston pin bores and the piston pins must
be free of varnish or scuffing when being
measured.
(2) Use a micrometer in order to measure the
piston pin.
(3) Use an inside micrometer in order to measure
the piston pin bore. Replace the piston and
piston pin if the clearance is in excess of
0.0254 mm (0.001 in).
(4) Match the piston and piston pin. Do not service
separately.
11. Measure the piston compression ring end gap.
IMPORTANT: Fit each compression ring to the
cylinder in which it will be used.
(1) Place the compression ring into the cylinder
bore.
(2) Push the compression ring into the cylinder
bore approximately 6.5 mm (0.25 in) above the
ring travel.
The ring must be square to the cylinder wall.
(3) Use a feeler gauge in order to measure the
end gap.
(4) Select another size ring set if the end gap
exceeds specifications.
VE069-3L
VE068-3L
VE067-3L

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan GC25P-3 and is the answer not in the manual?

Doosan GC25P-3 Specifications

General IconGeneral
BrandDoosan
ModelGC25P-3
CategoryEngine
LanguageEnglish

Related product manuals