EasyManua.ls Logo

Dräger Aerotest Alpha - Preparation

Dräger Aerotest Alpha
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Preparation
Clean the compressed air supply connection by blowing it clear.
Clean the measuring unit. It must be free of particles and dust.
Check pass-through of the measuring unit (see page 23).
1 Connect the measuring unit to the compressed air supply
connection. The maximum supply pressure is 15 bar. If necessary,
use the adapter.
Outlet pressure 3 bar adjustable at the pressure-reducing valve
with pressure gauge.
Slowly open the compressed air supply valve and flush the system
(allow compressed air to be exhausted through the system).
Flushing time for a regularly maintained system:
2 to 3 minutes.
For other systems:
5 to 6 minutes.
Then close the valve.
Set the timer: 5 minutes.
Strictly follow the specific Instructions for Use.
00321437.e
p
s
1
Oil CO H
2
OCO
2

Related product manuals