EasyManua.ls Logo

Dräger PSS BG 4 plus

Dräger PSS BG 4 plus
163 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PSS BG 4 Service Manual
Draeger Safety, Inc.
Check Relief Valve
1 Set “positive pressure pumping”.
2 Continue pumping until
3 the relief valve opens.
4 Read off the opening pressure on the
pressure gauge: It should lie between 2 and
5 mbar.
The low-pressure warning generated by the Sentinel
during this test is irrelevant here.
Page 54
Draeger Training 11/16 rev 1

Table of Contents

Related product manuals