D-1000B Heater Operations & Maintenance
MAINTENANCE, and REPAIR PROCEDURES 5-13 DHS SYSTEMS LLC
No rights are conveyed except as indicated in the legend on the inside front cover of this document.
Fuel Nozzle Installation Procedures (Cont)
7. Reconnect ground wire (103) to the terminal lug (94) on combustion head (40).
8. Install heat shield (05). Using an 8mm nut driver install and tighten six screws (79) and two sheet metal screws
(78) to secure heat shield.
9. Install the top cover and four quick release pins as shown in Figure 5-1.
10. Test heater in accordance with the operations manual. (See Chapter 6).