EasyManua.ls Logo

DURAVIT DuraSystem A2 - Reassembling Battery Compartment and Cables; Threaded Rod Installation

DURAVIT DuraSystem A2
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
1
2
3
Inserting the battery compartment
> Connect the cable to the battery
compartment.
> Insert the battery compartment into the
protective maintenance plate by placing
it at the rear, pulling it back carefully
and pressing down on the plate at the
front until it engages.
> Pull the battery cable through the cable
opening.
Laying the cable
> Pay attention to the cable routing.
Screwing in the threaded rod
> Turn the enclosed threaded rod (service
accessories kit) in the opening of the
plate in order to thread the lever of the
motor mechanism into the eyelet of the
flush valve.
en

Table of Contents

Related product manuals