EasyManuals Logo

Dynapac CC102C Maintenance Manual

Dynapac CC102C
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #32 background imageLoading...
Page #32 background image
30 CC102/C/122/C/132/142/C M102EN4
The following instructions should be followed
for parking longer than one month:
The measures apply for a period of up to 6
months.
The items marked * must be restored before
using the roller.
Fig. 52 Roller protected against the weather
LONG-TERM PARKING
Battery
Diesel engine
Air cleaner, exhaust pipe
Fuel tank
Hydraulic reservoir
Sprinkler system
Steering cylinder, hinges, etc.
Tires (combo)
Hoods, tarpaulin
*
See manufacturer’s instructions in the engine ma-
nual that accompanies the roller.
*
Remove the battery from the roller, clean it, check
that the electrolyte level is correct (see under the
heading ”Every 50 hours of operation”) and trickle
charge the battery once a month.
*
Cover the air cleaner (see under the headings
”Every 50 hours of operation” and ”Every 1000
hours of operation”) or its intake opening with plastic
or tape. Cover the exhaust pipe opening. This is
necessary to prevent moisture from entering the
engine.
Fill the fuel tank completely to prevent condensation.
Fill the hydraulic reservoir to the uppermost level mark;
see under the heading ”Every 10 hours of operation”.
*
Empty the water tank completely (see under the
heading ”Every 10 hours of operation”), and also
hoses, filter housing and the water pump. Remove
all the sprinkler nozzles (see under the heading
”Every 10 hours of operation”). Also drain the emul-
sion tank (see under the heading ”Every 2000 hours
of operation”).
Lubricate bearings of the steering joint and both
bearings of the steering cylinder with grease (see
under the heading ”Every 50 hours of operation”).
Grease the piston rod of the steering cylinder with
inhibitor grease. Grease the hinges on doors to the
engine compartment and the cab, and also grease
both ends of the forward/reverse control (bright
parts) (see under the heading ”Every 500 hours of
operation”).
Make sure that tire pressure is at least 200 kPa (2.0
kp/cm
2
) psi.
*
Lower the instrument shield plate on the steering
column. Cover the entire roller with a tarpaulin. The
tarpaulin must be free from the ground. Store the
roller indoors if possible, preferably on premises with
an even temperature.

Other manuals for Dynapac CC102C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dynapac CC102C and is the answer not in the manual?

Dynapac CC102C Specifications

General IconGeneral
BrandDynapac
ModelCC102C
CategoryConstruction Equipment
LanguageEnglish

Related product manuals