BOILER
START-UP
• Final Checks
And
Operations
~
Information
Having completed the installation
and
connections (flue, electricity
supply,
gas
supply
and
water circuits)
of
the
boiler according to
the
authorized
gas
company regulations
and
relevant standards,
the
final checks
and
operations
must
be
carried
out
by
qualified
person.
Filling the boiler
and
central
heating
circuit with water.
-
Firstly,
turn
on
all
the
radiator valves.
-
Check
inlet
and
outlet
CH
valves. The valves must
be
open.
-Remove
the front
panel,
combustion
body
cover
(in
room sealed fan assisted boiler)
and
right side
panel
respectively.
-Open
manual
air vent
on
heat
exchangerl
).
-
Open
filling tap2) slowly
to
fill the system.
-Turn
off
the
air
vent
on
heat
exchanger
when water starts to squirt.
- Keep
up
filling until water pressure measures l ,5 - 2
bar
on the thermomanometer.
-
Turn
off
the
filling
tap.
A
CAUTION:
Do
not
forget to turn
off
the filling tap, water can
~
leak
and
cause damage.
-Turn on
the
air vents
to
set air free until water squirts. Repeat this process for all the radiators.
-Check
the
CH
water pressure on the thermomanometer
again,
and
turn
on
the filling
tap
to increase water pressure
to
l ,5-2
bar
level.
-Check
radiator vents whether
any
air
in
the
water pipes or not. Air must
be
purged
out
entirely for efficient heating.
-
Check
any
leakage
in the radiator
and
the
water
pipes finally.
[]]
Open
hot water
tap
to
check
DHW circuit.
Check
any
leakage
water
pipes.
[}]
Check
whether flue kit
is
comprised
of
original parts
or
not
according
to
the
instructions
and
regulations.
In addition,
> Electricity connections
of
boiler must
be
earthed
and
suitable with main supply conditions
(230 V
AC-
50
Hz).
:..
Gas supply must
be
checked
by
the qualified gas
company.
Call
qualified
service to boiler start-up after all these processes
ore
completed.
~
Bo;to,
.
<lad~p
mu<l
bo
pcdonnod
CC<lainly by
qualified
peNon.
~Information
After boiler start-up, you should request information about
operating
the
boiler
and
safety precautions from qualified
person.
l)
The
manual
air
vent
is
on
the
top
of
expansion vessel in bitermic types (CA 24
BB
- CA 24
HB).
2)
The
filling
tap
is
not
available
in some models
based
on national
and
local
regulations.
25