Installation
Points To Be Taken Into Consideration After Installation
WITHSTAND PERIODS AGAINST TO WATER AS PER STANDARD.
IP55 & IP65
Vertical Shaft Application
Pressure Water
3 Min.
1- The neutral bar of KX busbar shall be at the
bottom for horizontal busbar lines and on the
left for vertical busbar lines. (Figure 1)
2- In order to maintain the neutral bar at the
bottom and in the vertical busbar on the left, it
is required to use the phase changing module.
(Figure 1)
Phase Sequence Changer
Under water 30 min.
IP67
L3
L2
L1
N
L3
L2
L1
N
N L1 L2 L3 N L1 L2 L3
1