Handling & Storage
5- When the lengths and modules are required
to be taken from the pallets to the erection area,
those should be hoisted using metal rods or
bars passed through the 2 sets of holes at each
end of the housing body by ensuring the load is
stable and safely secured. Then adequate sling
and slinging method can be used for shifting
from one place to another.
6- The removal of the products from one floor
to the other floor must be done by means of
a suitable electric and mechanical crane or
elevator.
7- Repack the Busbar if you need to store or
hold before installation (Refer to chapter5.) as
long as conditions permit, do not disassemble
the busbar until it reaches the lastest
installation point.
8- Storage area should be a clean, dry space
with a uniform temperature to prevent
condensation and having adequate air
circulation and protected from dirt, fumes,
water. Storage area should be free of vehicle
trafc to prevent physical damage to the
products.
9- When busbar straight lengths and modules
are to be stored for certain time before
installation, restore the packing for protection
during that period and cover them with
waterproof sheet in very well protected area
from dust and any kind of liquid on sufcient
quantities of wooden bearers.
10- The busbar designed for the outdoor
environment are not weatherproof until the
insallation is complete and in accordance
with the instructions and above recommended
storage conditions must be applied for other
busbars.