Introduces the modular charging post and its configuration options.
Explains the meaning of symbols used within the installation guide.
Covers dimensions, weight, material, finish, colour, and IP rating.
Details adapter plate compatibility, rotation intervals, and electrical connection methods.
Specifies the recommended cable cross-sectional area for different connections.
Essential safety measures for product installation by certified electricians.
Critical precautions for safe operation and maintenance of the product.
Illustrates the standard parts included in the Easee Base kit.
Instructions for attaching the column to the adapter plate using screws.
Lists and illustrates the components for the 1-Way configuration.
Guides attaching the mounting plate and blind cover to the column.
Details threading the cable and fixing the Easee charger backplate.
Lists and illustrates the components for the 2-Way configuration.
Guides attaching the two mounting plates to the column.
Details threading cables and fixing two Easee charger backplates.
Lists and illustrates components for 3-Way and 4-Way setups.
Steps for mounting the bottom frame onto the column.
Steps for mounting the top frame onto the column.
Attaching the top plate to the top frame.
Attaching the first two Easee charger backplates to the column.
Installing the last charger backplate or blind cover for a 3-way setup.
Attaching the last two charger backplates for a 4-way setup.
Emphasizes authorized electrician requirement and power disconnection.
Steps for securing the ground plate to the terminal.
Securing the grounding nut and tightening the PE terminal screw.
Explains terminal lanes for PE and power in/out.
Details terminal usage for 1, 2, 3, or 4 chargers.
Details cable preparation, stripping, and screw torque.
Wiring instructions for TN 1-phase and 3-phase grids.
Wiring instructions for IT/TT 1-phase and 3-phase grids.
Final step of attaching the side panel after all wiring is completed.
Discusses mechanical foundation requirements and alternative mounting.
Recommended torque values for various screws used in assembly.
Guidance on obtaining support, returns, and accessing documentation.