operating environment must meet the height, clearance, and environmental
requirements specified.
4.3.1 Environmental and installation considerations
The UPS system installation requires a TN, TT or IT power distribution system
(the IT distribution system shall include a neutral wire).
The UPS system installation must meet the following guidelines:
• The system must be installed on a level floor suitable for computer or
electronic equipment. The floor must be suitable for heavy weight and
wheeling.
• The system must be installed in a temperature and humidity controlled
indoor area that is free of conductive contaminants.
• The cabinet can be installed in line-up-and-match or standalone
configurations.
Failure to follow these guidelines may void your warranty.
CAUTION
Do not stack anything on top of the 93PS UPS cabinet.
Do not stack the UPS 93PS C-model cabinet on top of any other similar
cabinet(s).
If installed on a shelf, use suitable supports to prevent the UPS from tipping
or dropping.
The UPS equipment operating environment must meet the weight requirements
shown in Table
5
, and the size requirements shown in Table
4
.
Table 4: Dimensions
20 kW frame
[mm]
20 kW frame
C-model
[mm]
40 kW frame
[mm]
Shipping dimen-
sions (WxDxH)
540 x 857 x 1,460 540 x 857 x 705 750 x 820 x 1,975
Cabinet dimensions
(WxDxH)
335 x 750 x 1,300 335 x 750 x 645 480 x 750 x 1,750
Table 5: UPS cabinet weights with cardboard packaging
20 kW
frame
20 kW C-model
frame
40 kW
frame
Shipping weight 293 kg 98 kg 558 kg
Installed weight 280 kg 86 kg 532 kg