EasyManua.ls Logo

Eaton BiWire Flexi - System Wiring Diagram for Mixed Configurations

Eaton BiWire Flexi
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Routine Testing
7
5. Routine Testing
Under BS5839 it is the responsibility of the Premises
Management to undertake periodic tests to ensure the fi re
alarm system is operational. These tests are as follows:
5.1 Daily Testing (Premises Management)
To be conducted by the Premises Management.
Check that the panel shows no fi re or fault indications.
If there are any fault conditions indicated then follow
instructions in section 2.3.
5.2 Weekly Testing (Premises Management)
To be conducted by the Premises Management.
Each week perform a Lamp Test to check that all visual
and audible indicators on the panel are functioning
correctly (refer to section 6.8).
Each week a different zone should be tested. Testing with
a manual call point is the simplest method as these can be
easily triggered with the key provided. Testing with a fi re
detection device is more complex as it requires specialist
equipment and may not be possible for all premises. At a
minimum a different manual call point should be tested
each week.
Place the zone to be tested into test mode using
“Individual Zone Test” (refer to 6.7 for more details)
Record the weekly test results in the log book.
IT IS THE RESPONSIBILITY OF THE PREMISES
MANAGEMENT TO DEFINE A FIXED DAY AND TIME OF
WEEK THAT THE WEEKLY TEST IS PERFORMED. THIS
MUST BE COMMUNICATED TO ALL OCCUPANTS OF
THE PREMISES SO THEY KNOW NOT TO EVACUATE
DURING A WEEKLY TEST. IF AN AUTO-DIALLER OR
ALARM RECEIVING CENTRE (ARC) IS CONNECTED
TO THE FIRE SYSTEM THEN THE WEEKLY TEST
SCHEDULE MUST BE COMMUNICATED TO THEM AS
WELL.
5.3 Quarterly Testing (Competent Person)
To be conducted by the Competent Person. Included as
reference for the Premises Management.
Check all previous log book entries and verify that any
corrective actions had been taken.
Carry out the weekly test and record the results in the log
book.
Visually inspect the batteries and their connections.
Disconnect the mains supply and check that the fi re
system is capable of supplying the fi re alarm devices by
operating a call point.
5.4 Yearly Testing (Competent Person)
To be conducted by the Competent Person. Included as
reference for the Premises Management.
Carry out the weekly test and record the results in the log
book.
Carry out the Quarterly testing.
Test ALL fi re detection devices and manual call points.
IMPORTANT
March 2016 www.eaton.com
EATON BiWire Flexi User Manual (PR215-216-519-03 15-03-16, PINSTFLEXIUSER)

Other manuals for Eaton BiWire Flexi

Related product manuals