Use the following basic sequence of steps to install the Field Installed UPM (FI-UPM):
1. Create an installation plan for the FI-UPM (Chapter 3).
2. Prepare your site for the FI-UPM (Chapter 3).
3. Inspect and unpack the FI-UPM cabinet (Chapter 3).
4. Unload and install the FI-UPM cabinet (Chapter 4).
5. Complete the Installation Checklist (Chapter 4).
6. Have authorized service personnel install wiring, perform preliminary operational checks, and start
up the system.
NOTE
Wiring, startup, and operational checks must be performed by an authorized Eaton Customer
Service Engineer, or the warranty terms specified on page 23 become void. This service is
offered as part of the sales contract for the FI-UPM. Contact an Eaton service representative in
advance (usually a two-week notice is required) to request service.
3.1 Creating an Installation Plan
Before installing the FI-UPM, read and understand how this manual applies to the system being
installed. Use the procedures and illustrations in Section 3.2 and Chapter 4 to create a logical plan for
installing the system.
3.2 Preparing the Site
For the FI-UPM to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in this manual. If the FI-UPM is to be operated at an altitude higher than 1000 m,
contact an Eaton service representative for important information about high altitude operation. The
operating environment must meet the weight, clearance, and environmental requirements specified.
The FI-UPM installation must meet the following guidelines:
The system must be installed on a level floor suitable for computer or electronic equipment.
The system must be installed in a temperature and humidity controlled indoor area free of
conductive contaminants.
The cabinet must be installed in line-up-and-match configuration.
Failure to follow guidelines may void your warranty.
The FI-UPM operating environment must meet the weight requirements shown in Table 3-1 and the
size requirements shown in Figure 3-1 through Figure 3-6. Dimensions are in millimeters (inches).

Other manuals for Eaton Power Xpert 9395P

Related product manuals