EasyManua.ls Logo

Eaton Vickers DG3V-8 Series - Section X. Start-Up and Test

Eaton Vickers DG3V-8 Series
27 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
Section X - Start-Up and Test
A. Start-Up
Start the system and sequence the unit through all positions
while watching for appropriate movement of actuators.
Improper or erratic movement of the actuators may indicate
incorrect assembly of the unit or presence of trapped air.
B. Test
A test stand having regulated flow, temperature control and
special fixtures is required to fully test the performance of the
rebuilt unit. Because of this, only the functional test shown in
the start-up paragraph is given. If such a test stand is
available, test the unit to the requirements set forth in the
installation drawings.

Related product manuals