EasyManua.ls Logo

EcoKing C140 - User Responsibilities; Boiler Operation; Manufacturer Conditions; Installer Responsibilities

EcoKing C140
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part 1 Introduction
User responsibilities
This manual is for use only by a qualified heating installer / service technician. Only a registered installer /
service technician is allowed to perform the installation of the appliance and the first start-up of the system. Ask
the installer to explain the system to you. Refer to user’s Information manual for user reference. Have this boiler
and its vent system serviced / inspected by a qualified service technician, at least every 12 months.
Warning
Failure to keep the Vent and Combustion Air Intake clear of ice, snow, and other debris may result in
property damage, serious injury, or death.
Warning
Boiler operation
Should overheating occur or gas supply fail to shut off, do not turn off or disconnect electrical supply to
circulator. Instead, shut off the gas supply at a location external to the appliance.
Do not use this boiler if any part has been under water. Immediately call a qualified service technician to
inspect the boiler and to replace any part of the control system and any gas control that has been under water.
Manufacturer conditions
The manufacturer does not accept any liability for damage caused by non-observance of the installation
instructions. Service activities must exclusively be carried out by qualified installers using original parts.
Failure to comply with the above could result in severe personal injury, death or substantial property damage.
Installer responsibilities
A qualified installer is a licensed person who has appropriate training and a working knowledge of the
applicable codes, regulations, tools, equipment and methods necessary to install a boiler or water heater. The
Installer assumes all responsibility for a safe installation and that it meets the requirements of the EcoKing
instruction manual, as well as National and local codes. It is also the installer’s responsibility to inform the User /
Owner of their obligation with respect to the description under “User Responsibilities”. Failure to follow this
warning could result in fire, serious injury, or death.
This manual contains information of the EcoKing Heating Only H100, H140, H200 and Combination C100,
C140, and C200 boilers. Read all instructions, including this manual and all other information shipped with the
boiler, before installing. Perform steps in the order given. Store the manual in the transparent envelope adjacent
to the boiler.
The installer is liable for the installation and the first start-up of the appliance. The installer must observe
the following instructions:
Read the instructions of the appliance in the manuals delivered and observe these.
Install the appliance in compliance with the applicable law and standards: compliance of this boiler with CSA
B51 has not been verified due to an exemption provided in a provincial pressure vessel code.
The installation of the EcoKing gas appliance must conform to the requirements of this manual, your local
authority, and the CAN/CGA B149 Installation Codes. Where required by the Authority, the installation
must conform to the standard for Controls and Safety Devices for Automatically Fired Boilers ANSI/ASME
CSD-1.
Perform the first start-up and all checks that are required. See section 10 for manual /
automatic calibration.
Explain system functioning to the user.
Warn the user about the obligation to have the appliance serviced and inspected at least every
12 months.
Hand over all manuals to the user and inform the user about the storage location.
The EcoKing is a “Direct Vent”, Class IV appliance requiring a “Special Venting System”. Vent and Combustion
Air Intake piping must be piped to the outdoors . Failure to follow instructions will result in serious injury or death.
When servicing boiler
To avoid electric shock, disconnect electrical supply before performing maintenance.
When pressure testing boiler
The boiler and its individual gas pressure valve must be disconnected from the gas supply piping system during
any pressure testing of that system at test pressures in excess of 6.5 kPa (0.95 psi). The boiler must be isolated
from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of
the gas supply piping system at test pressures equal to or less than 6.5 kPa (0.95 psi).
7

Table of Contents

Related product manuals