INSTRUCTION MANUAL ECOSOFT
®
MEDIA SYSTEMS
12
4. PRECAUTIONS
Remove power, shut o water supply and release pressure in the system before doing
any maintenance or repair. Protect from moisture inside parts of control valve.
Do not stress or load lter tank
• Keep track of salt in brine tank or salt compartment of cabinet. Replenish when necessary.
• To avoid fouling of media during prolonged downtime without power/water supply, ll the FRP tank
with brine as follows. Start manual regeneration, wait 20 minutes into the brine stage, then shut o
water supply and scroll regeneration cycles back to service. Then, turn o control valve.
• Perform regeneration when starting service after downtime.
• Inspect connections for leaks at least once in three months.
• Routinely check current time in control valve and correct if necessary.
• Maintain sediment prelter regularly.
Filter cartridge must be replaced if pressure drop exceeds 1 bar (14 psi)
2. Set current time by pressing SET.
See control valve manual for more information.
Activate or deactivate regeneration on Sunday night using ▲ or ▼ buttons. Regeneration on this
day will be performed if arrow is displayed against Regen
Similarly, activate or deactivate regeneration on Monday night using ▲ or ▼ buttons. Regeneration
on this day will be performed if arrow is displayed against Regen.
Scroll over all days of the week and select days for regeneration, then exit menu.
If the control valve is congured to regenerate once in 1…99 days, this option will be shown instead
of 1 week regeneration schedule