38
This manual is the intellectual property of Ecoso. Copying and reprinng is prohibited. © 2016
INSTALLER AND USER GUIDE FOR REVERSE OSMOSIS SYSTEM ECOSOFT ROBUST 1000, ROBUST 3000
4. INSTALLATION STEPS
4.1. INSTALLATION CONDITIONS AND PACKAGE COMPLETENESS CHECK
4.2. INSTALLATION
Carefully read this manual before installing the reverse osmosis system.
CAUTION!
This product has been factory tested for leaks, and may contain residual moisture.
Before installaon of tubing, lters, and membranes, wash your hands with anbacterial soap.
Ensure that the installaon place is shielded from the direct sunlight and removed from heang
appliances.
— check other parameters of the technical specicaon (secon 2.1);
— check that feed water meets requirements shown in secon 2.2.
If the water quality does not meet requirements, refer to a water treatment specialist company
3) Before proceeding with the installaon, ensure there is enough space for the assembled system.
If using pressure tank, provide room for it as well. In case of shortage of space, pressure tank can
be removed to the distance of connecng tube length.
4) Install the reverse osmosis system in accordance with below procedure.
*If any of the parameters does not meet the requirement, consult secon 2.1 for possible correcve
acon.
1) Check that all components of the reverse osmosis system (see secon 2.3) are inside the package.
Do not open the plasc bag before you make sure it contains all parts. Missing part claims will not
be accepted if the package is broken.
2) Ensure that your ulies meet this product’s requirements:
Test water pressure at the tapping point. It must
comply with the specicaon in secon 2.1.
Test water temperature and verify
compliance with specicaon in secon 2.1.