EasyManua.ls Logo

Elkay EZH2O - Page 8

Elkay EZH2O
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 8(630) 574-8484 2000002005
(Rev. B - 01/25)
Elkay Manufacturing Company
DSSBF8SP DSSBF8SP-W1
5. Installation of Cooler
1. Remove the drain access panel by removing the
5/16” hex screws on the rear side of the cooler unit.
2. Position the cooler unit facing front side.
3. Remove the lower front panel by removing the two
hex screws on the cooler unit using a 5/16” socket
or nut driver.
4. Take the lter box and drain kit package out of the
cooler unit.
Note: Filter box and drain kit are packed inside the
cooler unit during shipment.
5. Attach the nut, the seal, and the elbow tube to the
drain outlet and tighten it fully.
6. Connect one end of P-trap to the water drain tube
and other end to the drain outlet.
Note: P-trap is installer supplied part.
Lower Front
Panel
Elbow
Tube Seal
Nut
Drain Access
Panel

Related product manuals