Safety / Maintenance / Repair
BA_Elmasteam 4
5
_EN_Vers. 01.2019 © Elma Schmidbauer GmbH
7.2.2 For water containing chloride
Regular rinsing is also required for water containing chloride.
Otherwise, the chloride concentration in the pressure boiler
continues to increase and the forming hydrochloric acid attacks the
pressure tank.
Procedure as described in chapter 7.2.1 .
content
200 mg/l 150 mg/l 100 mg/l 50 mg/l 0 mg/l
interval
2 weeks 3 weeks 5 weeks 6 weeks 8 weeks
7.3 Clean sieve in the water connection (only P-HP)
The sieve in the water connection can be clogged by particles and
minerals in the supply system and the water supply to the machine
can be impaired.
Dependent on the water quality. At the latest if the pressure boiler
is no longer filled correctly.
•
Unplug mains plug
•
Close water supply to the machine
1. Remove hose on the permanent water connection (Fig. 4.4.3.F)
2. Pull out sieve using pliers
3. Clean sieve under running water
4. Replace sieve
5. Install water connection again correctly; check for secure
seating and leak tightness.
Fig. 7.2.3. Various views of sieve