EasyManuals Logo

EM TEST compact NX5 bsp-1-300-16 User Manual

Default Icon
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #110 background imageLoading...
Page #110 background image
EM TEST Compact NX5
Operating Manual V 1.06 110 / 143
12.2.
Operation
Dips Module for voltage Dips and short interruptions.
The menu offers different test routines for pulsed magnetic field testing.
Main Menu Power Fail for voltage dips and interrupt tests
The Power Fail menu offers different test routines for voltage dips and interrupt testing.
Quick Start
Easy and fast online-operation of the equipment for voltage DIPS and power interruption tests.
Standard
The operator can select between various preprogrammed test routines as required in different standards.
The operator can select the standard routine for 50/60Hz, depend of the measured frequency, testing as per IEC
61000-4-11.
Extended test
The operator can select between various preprogrammed test routines which helps to accelerate testing and
which are very helpful especially during design.
User test routines
The user defined library where all created power fail tests are stored.
Easy Link
Link files library created during the actual session. The user can easy save a test into the Easy Link library. After
switch off the Equipment all Easy Link tests are deleted. Use “SAVE AS USER TEST” for definitive save the test.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EM TEST compact NX5 bsp-1-300-16 and is the answer not in the manual?

EM TEST compact NX5 bsp-1-300-16 Specifications

General IconGeneral
BrandEM TEST
Modelcompact NX5 bsp-1-300-16
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals