EasyManua.ls Logo

Emerson Liebert FPC User Manual

Emerson Liebert FPC
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
AC Power
For Business-Critical Continuity™
Liebert FPC
User Manual - 15 kVA - 300kVA, 3 Phase, 50 & 60 Hz

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Emerson Liebert FPC and is the answer not in the manual?

Emerson Liebert FPC Specifications

General IconGeneral
BrandEmerson
ModelLiebert FPC
CategoryUPS
LanguageEnglish

Summary

Important Safety Instructions

Safe Handling and Electrical Precautions

Guidelines for safe handling of shipping bands and electrical circuits, plus battery disposal and qualified personnel requirements.

Installation Instructions

Unpacking and Initial Inspection

Steps for receiving, unpacking, and inspecting the unit for any shipping damage.

Handling Considerations

Guidance on safe handling of the unit, including caster use and pallet removal.

Unit Preparation

Steps for preparing the unit, such as removing panels and checking components.

Location Considerations

Details on selecting the FPC installation location, required clearances, and ventilation.

Floor Pedestal Installation

Instructions for installing optional floor pedestals for unit support and leveling.

Distribution Mounting and Wiring

Instructions for mounting additional distribution cabinets (FDC) and making electrical connections.

Power and Control Wiring

Covers input power, junction boxes, grounding, output connections, and control wiring.

Equipment Inspection and Startup

Internal Inspection Procedures

Steps for visually inspecting internal components and checking connections for tightness before energizing.

Initial System Startup Process

Guidance on performing initial system startup, including checklists, qualified personnel, and warranty requirements.

Inspection and Startup Checklist

Pre-Power Inspection Checklist

Detailed checklist for inspecting the unit's exterior, interior, and connections before applying power.

Startup Procedures and Voltage Checks

Steps for turning on power, checking voltages, phase rotation, and breakers during startup.

Monitoring System and Customer Alarms

Steps for checking basic indicators, power monitor panel, and customer-designated alarms.

Operating Instructions

Startup and Shutdown Procedures

Guidelines for placing the unit into service, normal shutdown, and manual restart.

Monitor Panel Functions

Explanation of basic and power monitor panels, including parameter display and control.

Maintenance and Service

Repair and Troubleshooting

Guidance on contacting service for repairs and basic troubleshooting of unit problems.

Inspection and Cleaning Schedule

Recommended schedule for general inspections, cleaning, and operational checks for system longevity.