EasyManua.ls Logo

Emerson Rosemount 975 - Page 21

Emerson Rosemount 975
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Tighten the back cover security screw.
Figure 2-13: Tilt mount
Figure 2-14: Closing security screw
A. Back cover security screw
B. Ground cable connection point
6. Connect the ground cable.
NOTICE
When the enclosed threaded plug is utilized in the conduit opening, it must be
installed with a minimum thread engagement in order to comply with explosion-
proof requirements. For straight threads, a minimum of seven threads must be
engaged. For tapered threads, a minimum of five threads must be engaged.
Plug and seal the unused conduit connection with the provided conduit plug.
Manual Installation
00809-1400-4975 September2023
Rosemount 975 21

Other manuals for Emerson Rosemount 975

Related product manuals