2  Preparing for installation
2.1  Preparation at location of installation
Before proceeding to install and commission the Rosemount SAM42
Acoustic Particle Monitor, ensure the following have been completed:
Procedure
1. Identify the location where the monitor will be installed.
This would typically be between 30 cm – 100 cm (75 cm
recommended) after a 90° bend; on the outside of the bend.
2. Ensure all cladding and insulation has been removed around
the circumference of the pipe at the sensor location.
The dimension drawing in Figure 2-1 provides guidance on
how the device will be installed on the pipe. It is suggested
that a length of 20 in. (0.5 m) is removed.
Note
Cladding or insulation can be replaced after the monitor
installation has been completed, provided that the head of the
sensor remains outside the insulation. Insulation materials can
be insulated around the sensor as desired and according to
local procedures.