EasyManua.ls Logo

Enapter Electrolyser 4.0 - 4. Installation of the Electrolyser; 4.1 Unpacking; 4.2 Tools, Material and Accessories Required

Enapter Electrolyser 4.0
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VERSION
DOCUMENT TITLE
RELEASE DATE
00
EL 4.0 Owner’s Manual
2022-09-12
EL Owner’s Manual – Rev.00 September 2022 17
4. INSTALLATION OF THE ELECTROLYSER
Any person working on the device must be familiar with the hazards and risks associated with installing,
commissioning, and running it.
4.1 UNPACKING
The device has been carefully inspected and tested before shipping. Visual checks for damage and
functional tests should be performed upon receipt. Please also check the yellow tilt watch stickers on
both sides of each carton box. If one or both of them have been triggered at more than 50°, please
contact the Enapter customer support team.
Please remove the thin foil that covers the chassis before mounting the device in its final position. Make
sure, to not remove the warranty labels on the backside when removing the foil.
Please do not dispose the original shipping materials. Enapter will not accept devices for repair or
replacement if they are returned without the original shipping boxes or equivalents for a safe transport.
If the shipping boxes cannot be kept, please recycle responsibly.
Attention! The device might get damaged when not transported appropriately!
If any damage has occurred during transport, please report this immediately to the
shipping agent and supplier. Afterwards, the device should be returned according to
the shipping instructions provided in this manual, in the section Transport,
Maintenance and Recycling”.
Warning! The device is heavy!
Never lift the device out of the packaging alone. The device weights over 40 kg. Please
see the datasheet for more details.
Use lifting aids if available.
Due to their weight and size, it is recommended to use a pallet cart or similar devices
to manoeuvre the box upon delivery.
If the box must be lifted somewhere, always lift with at least two persons.
4.2 TOOLS, MATERIAL AND ACCESSORIES REQUIRED
The following tools, equipment, and material are needed to connect the device successfully. Ensure the
material chosen for this task is compatible with hydrogen operation.
4.2.1 TOOLS
Wrenches depending on the pipes and connectors
Plastic pipe cutter (to cut the H
2
O pipe)
Slotted screwdriver (to screw in the power supply plug)
Stainless steel pipe cutter (to cut the H
2
Out, H
2
vent and O
2
vent pipe)
¼” and ⅜” tube bender (to bend the H
2
Out, H
2
vent and O
2
vent pipe)

Other manuals for Enapter Electrolyser 4.0

Related product manuals