EL – Owner’s Manual – Rev.00 – September 2022 23
4.5.2 HYDROGEN VENT CONNECTION GUIDE (H
2
VENT)
Connect the H
2
vent port, located at the bottom left of the front
panel, to your hydrogen vent outlet.
During ramp-up, after ramp down and every 6 h (35 barg
version)/every 3 h (8 barg version) during operation, the
electrolyser depressurises and releases up to 20 NL (35 barg
version)/5 NL (8 barg version) of hydrogen within 2 seconds with
a loud noise through the vent line. Please wear PPE earplugs
when being close to the devices. Venting is necessary to release
the water which has been extracted from the hydrogen.