EasyManua.ls Logo

Endress+Hauser Liquistation CSF48 - Page 23

Endress+Hauser Liquistation CSF48
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Liquistation CSF48 Mounting
Endress+Hauser 23
5.1.4 Connection for sample intake and for version with sample pump
Maximum suction height:
Vacuum pump: standard 6 m (20 ft) option 8 m (26 ft)
Peristaltic pump: standard 8 m (26 ft)
Maximum hose length: 30 m (98 ft)
Hose connection diameter
Vacuum pump: 10 mm (3/8 in) 13 mm (1/2 in) , 16 mm (5/8 in) or 19 mm (3/4 in)
internal diameter
Peristaltic pump: 10 mm (3/8 in) internal diameter
Intake speed:
> 0.6 m/s (> 1.9 ft/s) for 10 mm (3/8 in) ID, as per Ö 5893, US EPA
> 0.5 m/s (> 1.6 ft/s) for ≤ 13 mm (1/2") ID, in accordance with EN 25667, ISO 5667
Note the following when erecting the device:
Always lay the suction line so that it slopes upwards from the sampling point to the
sampler.
The sampler must be located above the sampling point.
Avoid siphoning effects in the suction line.
Requirements for the sampling point:
Do not connect the suction line to pressurized systems.
Use the suction filter to impede coarse and abrasive solids and solids which can cause
clogging.
Immerse the suction line in the direction of flow.
Take the sample at a representative point (turbulent flow, not directly at the bottom of the
channel).
Useful sampling accessories
Suction filter:
Impedes coarser solids and solids which can cause clogging.
5.1.5 Connection for sample intake on version with sampling assembly
Minimum height difference (sampling assembly to suction line gland): 0.5 m (1.6 ft)
Maximum hose length: 5 m (16 ft)
Diameter of hose connection: 13 mm (1/2 in)
Note the following when erecting the device:
Always lay the sample line so that it slopes downwards from the sampling point to the
sampler.
The sampler must be located below the sampling point.
Avoid siphoning effects in the suction line.
Requirements for the sampling point:
Connect the sampling assembly to pressurized systems with max. 6 bar (87 psi).
Avoid sampling points with bigger, abrasive solids that could clog the system.
Take the sample at a representative point (make sure the suction line is completely
submerged).

Other manuals for Endress+Hauser Liquistation CSF48

Related product manuals